Dear CLEO III Trigger and DAQ enthusiast: please find enclosed the (preliminary) agenda for the next DAQ/Trigger group meeting. The meeting will take place on September 27-28 at Ohio State (no, it's not a football Saturday). Following the structure of the previous meetings we will have plenary sessions to review the current status of the project and a number of parallel working group sessions. For some of the working groups we will have presentations to introduce the interesting topics. These will, however, be fairly brief to leave enough room for discussion. The working group structure, actually the whole agenda, is only a suggestion at this point and we would appreciate your feedback to ensure an interesting meeting. Regards, Mats and Klaus CLEO III DAQ/Trigger Meeting Ohio State University Columbus, Ohio Sept. 27 - 29 1996 Agenda (Preliminary Draft) Friday, Sept 27 9:00 Bagels and coffee 9:15 - 11:30 PLENARY SESSION I (DAQ) 9:15 Introduction and things Klaus Data Acquisition: Status, Plans and Problems Klaus 9:40 Fritz - Hardware and Software Rainer Verilog Simulation Mike 10:00 Databoard Status ? 10:30 Software Overview, Work at OSU Andreas 10:50 Crate Software, Work at Caltech Elliot 10:05 Slow Control Components, Work at KU Chris D. Database Update Don 11:30 - 12:30 WORKING GROUP SESSION I (Group 1: Crate Hardware) Cornell Prototype Crate, Crate monitoring Chris B. VIPA update, CDF crates Mike Discussion 12:30 - 2:00 Lunch at OSU Faculty Club 2:00 - 2:30 PLENARY SESSION II (L3 and Beyond) L3, Pass1, Reconstruction and Implications Dave for the Online System Kreinick 2:30 - 4:30 PLENARY SESSION III (Trigger) Overview Mats 10 Tracking: Hardware Timing Simulations Ed 10 Prototyping Randal 10 Pulser Board Tim 10 Stereo tracking update Mike Sivertz 15 Calorimeter: Tiling boards - analog George 10 - digital Jeremy 10 Tiling Processor Jesse 20 Prototyping Jeremy 10 Schedule Mats 5 4:30 - 5:00 Coffee and Donuts 5:00 - 7:00 WORKING GROUP SESSION II (Group 2: Slow Control Components and Hardware) LeCroy HV System, Fastbus tests Chris B. Crate Monitoring (if not covered in Group 1) Chris B. Crate Slow Control - Hardware Jana Info from CLEO III components Klaus Alice ChrisB. Marina Gas system ? Discussion: Are there any LSC's left? Group 3: Tracking Triggers (Randal) - axial details - stereo details - technology choices (Altera vs Xilinx) 8:00 Dinner at Tapatio's Saturday, Sept 28 9:00 Bagels and coffee 9:15 - 10:45 WORKING GROUP SESSION III (Group 4: Database) Is Illustra fast enough? Don Will we be save by the "Universal Server" et al. (C++) Interface CLEO III "Tables" License questions on-site and off-site Herb and (PASS2) reconstruction Group 5: Global Trigger & Timing (Mats) - Combining tracking & calorimetry - event timing & hardware time recording 10:45 - 12:30 WORKING GROUP SESSION IV (Group 6: SI3 Databoard) Wish list (SI3 group) VMEchip, Datapath, BufferManager Modifications (Group 8: Slow Control) Definition of ORBeline Interfaces (IDL) Group 9: Calorimeter Trigger (Jesse) - design details - processing & timing 12:30 - 2:00 Lunch (Pizza) 2:00 - 4:00 WORKING GROUP SESSION V (Group 10: RICH Beam Test) !!!!! this is cancelled !!!!! !!!!! Stay tuned for updates - or make suggestions!!!! RICH hardware status and goals for the beam test Marina Software (readout, monitoring, analysis) Camac Software Chul Infrastructure Group 11: DFC, Gating & Calibration (Mike Haney) 4:00 - 4:30 Coffee and Donuts 4:30 - 6:00 PLENARY SESSION IV (Working Group Summaries) Database Crate Hardware Slow Control Hardware (SI3) Databoard IDL Definitions Trigger Working Group 3 Trigger Working Group 5 Trigger Working Group 9 Trigger Working Group 11 7:00 Dinner If we stay with this agenda, there won't be any (scheduled) meetings on Sunday.